Relief well
Contents |
[edit] Introduction
The International Levee Handbook, published by CIRIA in 2013, defines a relief well in water and flood management terms as: 'A vertically installed well consisting of a well screen surrounded by a filter material designed to prevent in-wash of foundation materials into the well. Relief wells are used extensively to relieve excess hydrostatic pressure in impervious foundation strata overlain by more impervious top strata, conditions that often exist landside of levees and downstream of dams and various hydraulic structures.'
Relief wells are also used in the fossil fuel industry as a control measure for natural gas and petroleum drilling.
[edit] History
The use of relief wells goes back to the early 1900s. They were initially used in the fossil fuel sector to manage well pressure. In the 1940s, relief wells were used to manage water pressure associated with dams. The technique was later adopted as a precautionary measure during construction to control water tables that could destabilise the ground..
[edit] Maintenance
The US Army Corps of Engineers has incorporated relief wells into the design and construction of several dam projects since the 1940s. Based on its experience, the organisation has observed that the life cycle of relief wells includes a slow but steady decline in pump efficiency after five years of operation. Regular maintenance and pump testing is required.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.